Based on 2504 reviews
91%
(2270)
4%
(102)
1%
(37)
1%
(27)
3%
(68)
Telbix

Telbix Farbon Short Wall Light White

FARBON-WBS-WH
$64.80
  • Dispatches in 3-6 business days

The FARBON wall lamp is a great portrait of mid-century modernist style. The subtle curves and clean lines reflect the informal hip and trendy classic style. Presented in black or... Read more

Free Shipping On Orders $100+
Free Shipping On Orders $100+
Reputable Brand
Reputable Brand
Over 2200 happy customers
Over 2200 happy customers

The FARBON wall lamp is a great portrait of mid-century modernist style. The subtle curves and clean lines reflect the informal hip and trendy classic style. Presented in black or white with a brass matt flexi-arm for the control of directional light.

Colour and Material

  • Fixture Colour: Brass Matt, White
  • Fixture Material: Metal
  • Fixture Pantone Colour: RAL 9010
  • Canopy Colour: White
  • Shade Colour: White
  • Shade Material: Metal

Size

  • Fixture Height (cm): 15.00
  • Fixture Projection (cm): 37.00
  • Fixture Weight (Kg): 0.50
  • Fixture Width (cm): 20.00
  • Canopy Diameter (cm): 10.00
  • Canopy Projection (cm): 2.50
  • Shade Diameter (cm): 20.00
  • Shade Fitting: E27 (42mm HOLE)

Specifications

  • Approvals: RCM
  • Assembly Required: No
  • Box Contents (degree): Basic mounting screws, Instruction
  • Electrical Protection: CLASS I - HIGH VOLTAGE, EARTH REQUIRED
  • Globe / Light Source included: No
  • Globe / Light Source qty: 1
  • Globe Type: E27
  • Installation Required: Yes (by Licensed Electrician only)
  • IP Rating: IP20
  • Lead and Plug: No
  • Voltage Input: 240V
  • Replacement Warranty: *3 Years
  • Wattage (max): 25

Product Maintenance

  • Care Instructions: Do not use strong liquid cleaners, Wipe clean with a dry cloth
Brand:
Telbix
SKU:
FARBON-WBS-WH
Boxed Weight:
0.0 kg

Buildmat is offering Free Shipping Australia Wide on kitchen sinks.

Buildmat offers free shipping for all orders over $100.
All our orders are shipped from our Melbourne warehouse and are dispatched next business day.

Shipping time estimates are listed below. if you're really worried about delivery times feel free to call us and we can give you a more accurate estimate and also let you know who our courier for your area is.

Melbourne
1-3 business days
Sydney
2-5 business days
Adelaide
2-5 business days
Brisbane
2-7 business days
Canberra
2-5 business days
Hobart
2-7 business days
Darwin
3-10 business days
Perth
3-10 business days
Regional victoria
1-3 business days
Interstate regional areas
3-10 business days

Good indoor lighting transforms how your home looks and feels. Here's how to choose the right indoor lights for every room.

1. Think about what each room needs

Different rooms need different lighting. Kitchens and bathrooms need bright, practical light. Living rooms and bedrooms work better with softer, layered lighting you can adjust for different moods. Hallways and staircases need safe, consistent light that's always on when you need it.

2. Choose your light type

  • Ceiling lights: Main overhead lighting that brightens the whole room – essential for most spaces.
  • Pendant lights: Hang down from the ceiling, perfect over kitchen islands, dining tables, or as a feature piece.
  • Downlights: Recessed into the ceiling for a clean, modern look – great for kitchens, bathrooms, and hallways.
  • Wall lights: Sit on the wall to add ambient lighting, highlight artwork, or brighten hallways and staircases.
  • Vanity wall lights: Mount beside or above bathroom mirrors for even, flattering light – essential for bathrooms.
  • Floor lamps: Stand-alone lights that add warmth and flexibility to living rooms and bedrooms.
  • Table lamps: Sit on side tables or desks for reading, working, or bedside lighting.

3. Layer your lighting

The best rooms have three types of light working together:

  • Ambient: Overall lighting like ceiling lights or downlights
  • Task: Focused light for cooking, reading, or working, like pendant lights or table lamps
  • Accent: Decorative lighting like wall lights or floor lamps that add warmth and style

4. Pick lights that suit each room

  • Kitchen: Bright downlights or ceiling lights for general light, plus pendant lights over the island or bench for task lighting.
  • Bathroom: Vanity wall lights beside the mirror for even lighting, plus downlights or a ceiling light for overall brightness.
  • Living room: Mix ceiling lights with floor lamps and table lamps so you can adjust the mood.
  • Bedroom: Soft ceiling lights with table lamps beside the bed for reading.
  • Hallways & stairs: Wall lights or staircase lights for safe, consistent lighting.

5. Set your budget

Basic ceiling lights and downlights start around $50–$150 each. Pendant lights range from $100–$400+. Floor lamps and table lamps sit between $80–$300, depending on size and design. Designer or statement pieces can cost more, but good lighting makes a huge difference to how your home feels.

Need help choosing?

Browse our full range of indoor lighting to find the perfect lights for every room in your home. Or visit our building and renovating tips blog for practical advice, real renovation examples, and the latest trends to help you design with confidence.

The FARBON wall lamp is a great portrait of mid-century modernist style. The subtle curves and clean lines reflect the informal hip and trendy classic style. Presented in black or white with a brass matt flexi-arm for the control of directional light.

Colour and Material

  • Fixture Colour: Brass Matt, White
  • Fixture Material: Metal
  • Fixture Pantone Colour: RAL 9010
  • Canopy Colour: White
  • Shade Colour: White
  • Shade Material: Metal

Size

  • Fixture Height (cm): 15.00
  • Fixture Projection (cm): 37.00
  • Fixture Weight (Kg): 0.50
  • Fixture Width (cm): 20.00
  • Canopy Diameter (cm): 10.00
  • Canopy Projection (cm): 2.50
  • Shade Diameter (cm): 20.00
  • Shade Fitting: E27 (42mm HOLE)

Specifications

  • Approvals: RCM
  • Assembly Required: No
  • Box Contents (degree): Basic mounting screws, Instruction
  • Electrical Protection: CLASS I - HIGH VOLTAGE, EARTH REQUIRED
  • Globe / Light Source included: No
  • Globe / Light Source qty: 1
  • Globe Type: E27
  • Installation Required: Yes (by Licensed Electrician only)
  • IP Rating: IP20
  • Lead and Plug: No
  • Voltage Input: 240V
  • Replacement Warranty: *3 Years
  • Wattage (max): 25

Product Maintenance

  • Care Instructions: Do not use strong liquid cleaners, Wipe clean with a dry cloth
Brand:
Telbix
SKU:
FARBON-WBS-WH
Boxed Weight:
0.0 kg

Buildmat is offering Free Shipping Australia Wide on kitchen sinks.

Buildmat offers free shipping for all orders over $100.
All our orders are shipped from our Melbourne warehouse and are dispatched next business day.

Shipping time estimates are listed below. if you're really worried about delivery times feel free to call us and we can give you a more accurate estimate and also let you know who our courier for your area is.

Melbourne
1-3 business days
Sydney
2-5 business days
Adelaide
2-5 business days
Brisbane
2-7 business days
Canberra
2-5 business days
Hobart
2-7 business days
Darwin
3-10 business days
Perth
3-10 business days
Regional victoria
1-3 business days
Interstate regional areas
3-10 business days

Good indoor lighting transforms how your home looks and feels. Here's how to choose the right indoor lights for every room.

1. Think about what each room needs

Different rooms need different lighting. Kitchens and bathrooms need bright, practical light. Living rooms and bedrooms work better with softer, layered lighting you can adjust for different moods. Hallways and staircases need safe, consistent light that's always on when you need it.

2. Choose your light type

  • Ceiling lights: Main overhead lighting that brightens the whole room – essential for most spaces.
  • Pendant lights: Hang down from the ceiling, perfect over kitchen islands, dining tables, or as a feature piece.
  • Downlights: Recessed into the ceiling for a clean, modern look – great for kitchens, bathrooms, and hallways.
  • Wall lights: Sit on the wall to add ambient lighting, highlight artwork, or brighten hallways and staircases.
  • Vanity wall lights: Mount beside or above bathroom mirrors for even, flattering light – essential for bathrooms.
  • Floor lamps: Stand-alone lights that add warmth and flexibility to living rooms and bedrooms.
  • Table lamps: Sit on side tables or desks for reading, working, or bedside lighting.

3. Layer your lighting

The best rooms have three types of light working together:

  • Ambient: Overall lighting like ceiling lights or downlights
  • Task: Focused light for cooking, reading, or working, like pendant lights or table lamps
  • Accent: Decorative lighting like wall lights or floor lamps that add warmth and style

4. Pick lights that suit each room

  • Kitchen: Bright downlights or ceiling lights for general light, plus pendant lights over the island or bench for task lighting.
  • Bathroom: Vanity wall lights beside the mirror for even lighting, plus downlights or a ceiling light for overall brightness.
  • Living room: Mix ceiling lights with floor lamps and table lamps so you can adjust the mood.
  • Bedroom: Soft ceiling lights with table lamps beside the bed for reading.
  • Hallways & stairs: Wall lights or staircase lights for safe, consistent lighting.

5. Set your budget

Basic ceiling lights and downlights start around $50–$150 each. Pendant lights range from $100–$400+. Floor lamps and table lamps sit between $80–$300, depending on size and design. Designer or statement pieces can cost more, but good lighting makes a huge difference to how your home feels.

Need help choosing?

Browse our full range of indoor lighting to find the perfect lights for every room in your home. Or visit our building and renovating tips blog for practical advice, real renovation examples, and the latest trends to help you design with confidence.

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)

You may also like

Buildmat are committed to offering our customers the lowest price possible.

That means if you’ve seen an identical product at a lower price let us know and we can adjust our quotes. This excludes trade quotes, stock liquidation or clearances, commercial quantities, and unauthorised resellers.
Buildmat reserves the right to reject any price match request at their discretion
Once our price review is complete, we’ll send you a payment link to safety and securely pay for your purchase.